Why does hub throughput drop at peak?
- Arrival bunching. Inbound trucks arrive in waves, so docks and labour are overloaded and then idle.
- Static door plans. Door assignments are fixed at the start of the day and not updated.
- Labour in the wrong place. Teams are allocated by habit rather than by the work due next.
- Manual coordination. Supervisors coordinate by radio and walking the floor, which does not scale with volume.
- Hidden bottlenecks. Without data per process, the true constraint is hard to find.
What does it cost?
When throughput drops, the hub needs extra shifts, temporary staff and sometimes overflow space to clear backlogs. Late departures then pass the delay on to the rest of the network.
Peak periods often carry the highest revenue, so lost throughput is lost business at the worst moment.
How do you increase hub throughput?
- Find the real constraint. Measure throughput by process: receiving, sortation, staging and loading.
- Sequence arrivals. Spread inbound slots to match dock and labour capacity.
- Assign doors dynamically. Reassign doors as trucks run early or late.
- Direct labour to the next task. Give operators their next job on a device instead of by radio.
- Review each peak. Compare plan with actual after each peak and adjust rules.
How MIXMOVE helps
MIXMOVE HUB OS plans the path of every unit through the hub and adjusts doors, labour and loading as the shift unfolds. Supervisors see the live picture of the floor without walking it.
DHL Supply Chain UK&I increased hub throughput by 130%+ with MIXMOVE HUB OS. MIXMOVE works alongside an existing TMS, WMS and ERP as an orchestration layer, or as a standalone platform.
Frequently asked questions
Does higher throughput need more space?
Not necessarily. Better sequencing often moves more volume through the same floor.
How is hub throughput measured?
Usually as units, pallets or parcels handled per hour or per shift, tracked by process.