Why do freight tenders matter?
Tendering is how contracted capacity is actually used. When a carrier rejects a tender, the shipper moves to the next carrier in the routing guide and, if none accepts, to the spot market at a higher price. Tender acceptance therefore links contract rates, capacity and cost in one measure.
How does freight tendering work?
- Lane bid. The shipper invites carriers to bid on lanes and expected volumes, often once a year.
- Award. Lanes are awarded and a routing guide sets the order of carriers per lane.
- Load tender. Each shipment is offered to the first carrier in the guide, who accepts or rejects it.
- Fallback. Rejected loads go to the next carrier or to the spot market.
Accurate volume forecasts in the bid make tender acceptance more likely later.
The MIXMOVE perspective
Tenders fail most often when demand becomes visible too late. MIXMOVE DI brings expected orders, shipment volumes and transport requirements into one planning view and uses order, shipment and network data to anticipate capacity needs, with up to 20% better alignment of reserved transport capacity to real needs. Planners can secure capacity earlier and rely less on last-minute sourcing.
MIXMOVE works alongside an existing TMS, WMS and ERP as an orchestration layer, or as a standalone platform.
Frequently asked questions
What is a tender rejection?
A carrier declining a load offered at the agreed rate, often because it has no truck free or the spot market pays more.
How often are lanes tendered?
Many shippers run a main lane bid once a year, with smaller mini-bids when markets or volumes shift.