Why does EV charging scheduling matter?
Electric vehicles turn energy into an operational constraint. A truck that is not charged in time misses its departure, chargers are limited, and site power connections cap how many vehicles can charge at once. Charging that competes with loading and dock time slows the whole yard.
Most urban and regional electric fleets charge at their own depot or hub, often overnight or during loading breaks.
What does charging scheduling take into account?
- Departure times and the route distance of each next trip
- Vehicle state of charge and expected load
- Number of chargers and site power capacity
- Dock and loading activity at the same time
- Energy tariffs and off-peak periods
The MIXMOVE perspective
Charging belongs in the same plan as docks and departures. Yard Management in MIXMOVE HUB OS coordinates charging in the same system that manages dock and vehicle status, scheduling it against vehicle status, expected load, route distance and departure timing, so each EV has the range for its next movement. Trip Planning & Execution plans routes around EV constraints.
MIXMOVE works alongside an existing TMS, WMS and ERP as an orchestration layer, or as a standalone platform.
Frequently asked questions
Where do electric trucks usually charge?
Mostly at the depot or hub, overnight or during loading, with public fast charging for longer routes.
Why link charging to the yard plan?
Because chargers, docks and departures compete for the same vehicles and time. Planning them together avoids missed departures.